Projects
Silverwood: Full Exterior Rehab
Lorem Ipsum has been the industry’s standard dummy text ever since the 1500s, when an unknown printer took a galley of type and scrambled it to make a type specimen book.

The Challenge
We gave this beautiful property a much needed face lift! Check out how well it turned out below:
Notes:
Prep work is essential to ensure durability. If you do not take the time up front to prep & prime the surfaces properly, then you run the risk of having adherence issues when you go to paint the final product. This could lead to costly delays that eat up your rehab budget.

The Solution
Project Scope:
- Replaced damaged trim, fascia and siding
- Re-built patio fences
- Fully primed siding before final paint coat
- Total buildings: 13
- Total units: 208
The Impact
These photos show the project work and key steps in the process.

Need a Partner You Can Count On?
We’re ready when you are. Let’s see what we can build together.